310 W Water St.
Toms River, NJ 08753
732-492-3968

Our Top Cities


Local Reviews
for red bank, nj

Rated 4.5 out of 5 stars based on 4 customer reviews

Outstanding service

Outstanding technicians, Try & Devin. Very knowledgeable, professional and explained everything in detail.

  • Overall Experience
  • Quality
  • Price
  • Convenience

Fantastic & quick service!

Matt and Andrew were great! They arrived promptly, talked through everything with me, kept me informed throughout, and finished the job quickly & well. They were perfectly professional & were diligent about not tracking dirt or grit around the house. Highly recommend the company & these technicians specifically.

  • Overall Experience
  • Quality
  • Price
  • Convenience

Great service but cost especially parts cost is expensive.

  • Overall Experience
  • Quality
  • Price
  • Convenience

Excellent Service

MyGuy Plumbing is excellent company. Tech is super friendly and keeps you informed of arrival, details on service and thoroughly fills you in if there are any choices/options available. Front office is friendly and responsive too. Highly recommend!

  • Overall Experience
  • Quality
  • Price
  • Convenience

Job Locations
for red bank, nj

Javon V.

Javon V. Job Checkin

Arrived on site client stated they got an estimate to remove all cast iron and galvanized and would like a second opinion. Upon inspection there is about 40 ft of cast iron and about 30 ft in total of galvanized piping. Left options to either just remove all cast and galvanized that is visible in basement or to also remove section of pipe that is behind the first floor bathroom which would involve removing vanity and removing some tile. Will credit back 59 if client decides to move forward with work.

Arrived on site client stated they got an estimate to remove all cast iron and galvanized and would like a second opinion. Upon inspection there is about 40 ft of cast iron and about 30 ft in total of galvanized piping. Left options to either just remove all cast and galvanized that is visible in basement or to also remove section of pipe that is behind the first floor bathroom which would involve removing vanity and removing some tile. Will credit back 59 if client decides to move forward with work. Arrived on site client stated they got an estimate to remove all cast iron and galvanized and would like a second opinion. Upon inspection there is about 40 ft of cast iron and about 30 ft in total of galvanized piping. Left options to either just remove all cast and galvanized that is visible in basement or to also remove section of pipe that is behind the first floor bathroom which would involve removing vanity and removing some tile. Will credit back 59 if client decides to move forward with work.

Jacob K.

Jacob K. Job Checkin

Provided options to repair boiler loop heat line. Middletown Township, NJ 07748

Provided options to repair boiler loop heat line. Middletown Township, NJ 07748

Matt C.

Matt C. Job Checkin

2 customer supplied lav faucets, 4 shut off valves under sink with membership has been chosen for today’s visit. Replaced old faucets with new ones, checked all work once completed. There are no leaks at this time. We will honor bundle discount if customer decides to go with any other option and will credit accordingly.

2 customer supplied lav faucets, 4 shut off valves under sink with membership has been chosen for today’s visit. Replaced old faucets with new ones, checked all work once completed. There are no leaks at this time. We will honor bundle discount if customer decides to go with any other option and will credit accordingly. 2 customer supplied lav faucets, 4 shut off valves under sink with membership has been chosen for today’s visit. Replaced old faucets with new ones, checked all work once completed. There are no leaks at this time. We will honor bundle discount if customer decides to go with any other option and will credit accordingly.

Charles L.

Charles L. Job Checkin

Removed washer to access the Sheetrock behind the shower valve. Cut Sheetrock to expose piping. Disconnected and removed existing shower valve from the home. Supplied and installed Moen posi temp shower valve with remodel trim kit. Soldered my connections and turned the water on to check for leaks. There are no leaks at this time. Installed shower trim and caulked the plate and tub spout. Supplied and installed new Moen magnetic shower head for client as well. *There was a quote to replace the water main as well, in order to do so, I would need to shut off the whole building to replace the shut off located in the laundry room. HOA would need to be notified of this and would need to schedule that service for a later date.

Removed washer to access the Sheetrock behind the shower valve.
Cut Sheetrock to expose piping.
Disconnected and removed existing shower valve from the home.
Supplied and installed Moen posi temp shower valve with remodel trim kit.
Soldered my connections and turned the water on to check for leaks.
There are no leaks at this time.
Installed shower trim and caulked the plate and tub spout.
Supplied and installed new Moen magnetic shower head for client as well.

*There was a quote to replace the water main as well, in order to do so, I would need to shut off the whole building to replace the shut off located in the laundry room. HOA would need to be notified of this and would need to schedule that service for a later date. Removed washer to access the Sheetrock behind the shower valve.
Cut Sheetrock to expose piping.
Disconnected and removed existing shower valve from the home.
Supplied and installed Moen posi temp shower valve with remodel trim kit.
Soldered my connections and turned the water on to check for leaks.
There are no leaks at this time.
Installed shower trim and caulked the plate and tub spout.
Supplied and installed new Moen magnetic shower head for client as well.

*There was a quote to replace the water main as well, in order to do so, I would need to shut off the whole building to replace the shut off located in the laundry room. HOA would need to be notified of this and would need to schedule that service for a later date.

Javon V.

Javon V. Job Checkin

Arrived on site and client stated her downstairs bathroom was clogged. Upon inspection client also has cleanout by the street. Put camera down the line and found massive ball of toilet paper. Snaked main from the cleanout by the street and restored flow. Client can now use water.

Arrived on site and client stated her downstairs bathroom was clogged. Upon inspection client also has cleanout by the street. Put camera down the line and found massive ball of toilet paper. Snaked main from the cleanout by the street and restored flow. Client can now use water. Arrived on site and client stated her downstairs bathroom was clogged. Upon inspection client also has cleanout by the street. Put camera down the line and found massive ball of toilet paper. Snaked main from the cleanout by the street and restored flow. Client can now use water.

Jacob K.

Jacob K. Job Checkin

Provided options to replaced both lavatory faucets. Red Bank, NJ 07701

Provided options to replaced both lavatory faucets. Red Bank, NJ 07701

Devin A.

Devin A. Job Checkin

Arrived on site customer stated that they had a leaking water heater upon inspection found that the heater was leaking from the tank itself and it would need to be replaced. Gave options and replaced tank water heater and install two leak breaker with pan. After testing all work found laundry sink faucet was leaking as well and replaced that. Registered all products and brought everything up to code tested all work and everything appears to be in working order and there appears to be no leaks at this time. Collected payment. Customer is responsible for paying permits and scheduling inspection. Chimney clay 8” 4” smoke pipe 40k btu

Arrived on site customer stated that they had a leaking water heater upon inspection found that the heater was leaking from the tank itself and it would need to be replaced. Gave options and replaced tank water heater and install two leak breaker with pan. After testing all work found laundry sink faucet was leaking as well and replaced that. Registered all products and brought everything up to code tested all work and everything appears to be in working order and there appears to be no leaks at this time. Collected payment.

Customer is responsible for paying permits and scheduling inspection.


Chimney clay 8” 4” smoke pipe 40k btu Arrived on site customer stated that they had a leaking water heater upon inspection found that the heater was leaking from the tank itself and it would need to be replaced. Gave options and replaced tank water heater and install two leak breaker with pan. After testing all work found laundry sink faucet was leaking as well and replaced that. Registered all products and brought everything up to code tested all work and everything appears to be in working order and there appears to be no leaks at this time. Collected payment.

Customer is responsible for paying permits and scheduling inspection.


Chimney clay 8” 4” smoke pipe 40k btu

Devin A.

Devin A. Job Checkin

Installed water heater in red bank nj

Installed water heater in red bank nj

Javon V.

Javon V. Job Checkin

Hardness 6 pH 7.0 Arrived on site to perform plumbing inspection. All shutoffs appear to be in working order. No leaks were found on inspection and toilets passed dye test.


Jacob K.

Jacob K. Job Checkin

Inspected leak coming through kitchen ceiling. Red Bank, NJ 07701

Inspected leak coming through kitchen ceiling. Red Bank, NJ 07701

Sean M.

Sean M. Job Checkin

Collected water samples in Rumson


Matt C.

Matt C. Job Checkin

Arrived to home to install RO faucet we ordered. Upon arrival we discovered that the faucet we ordered was not the correct one. While here we noticed 4 valves under the sink were old and one of them was leaking slightly. MyGuy created estimate to replace 4 valves under kitchen sink, as well as replace RO faucet. Once we acquire correct RO faucet we will contact customer to get her on schedule. Arrived back to complete install. MyGuy supplied and installed new RO faucet, drain clamp and r shut off valves. Tested for leaks there are none at this time.

Arrived to home to install RO faucet we ordered. Upon arrival we discovered that the faucet we ordered was not the correct one. While here we noticed 4 valves under the sink were old and one of them was leaking slightly. MyGuy created estimate to replace 4 valves under kitchen sink, as well as replace RO faucet. Once we acquire correct RO faucet we will contact customer to get her on schedule.
Arrived back to complete install. MyGuy supplied and installed new RO faucet, drain clamp and r shut off valves. Tested for leaks there are none at this time. Arrived to home to install RO faucet we ordered. Upon arrival we discovered that the faucet we ordered was not the correct one. While here we noticed 4 valves under the sink were old and one of them was leaking slightly. MyGuy created estimate to replace 4 valves under kitchen sink, as well as replace RO faucet. Once we acquire correct RO faucet we will contact customer to get her on schedule.
Arrived back to complete install. MyGuy supplied and installed new RO faucet, drain clamp and r shut off valves. Tested for leaks there are none at this time.

Matt C.

Matt C. Job Checkin

Replaced valves under sink red bank nj


Jacob K.

Jacob K. Job Checkin

Provided options to install new gas line for log set fire place. Fair Haven, NJ 07704

Provided options to install new gas line for log set fire place. Fair Haven, NJ 07704

Devin A.

Devin A. Job Checkin

Locate, assess, and repair leak @ curb key ****Job cancelled- $2000 deposit refunded 9/20/25**** Customer's will reach out if needed once they can clarify if this will be covered by town. They may be on the townships list to replace the full line as they just realized they received a letter about it and should find out more information this Monday.